1

High-Efficiency 400 kW Chiller Installation Achieves Fifty Thousand Pounds Yearly Energy Savings and 200 Tonnes CO₂ Saving

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has commissioned a cutting-edge 400 kW chiller, marking the successful conclusion of the project. Designed to advance ESG targets, the installation boosts system dependability while minimising overall power consumption and CO₂ levels. https://getsocialnetwork.com/story6261895/high-efficiency-400-kw-chiller-installation-secures-fifty-thousand-pounds-yearly-energy-savings-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story